Tec-Source EECS

Electrical Engineering & Consultancy Services

Marine Consultants, Clark and Standfield, have engaged Tec-source EECS to review the electrical specification, and design drawings for the  floating dock being built for Qatar Petroleum. The dock which will be 163M x 38M is part of the man made Ras Laffan Port.

The dock will be fitted with a state of the art Docking Control  System which will enable the automatic preparation of pumping plans using principal characteristics of ships (or hydrostatic data when known), their blocking length, weight and centre, docking draft and position.